Services

  • Project Development and Consultancy
    • Determination of the area where the Solar Power Plant will be established.
    • Feasibility studies on the area of investment
    • Making applications and obtaining necessary permits
  • EPC (Engineering, Procurement and Construction)
    • Development of projects based on the connection permit obtained from the distribution company
    • Obtaining approval of Turkish Electricity Distribution Corporation (TEDAŞ) for the projects
    • Procurement of materials used in the project phase
    • Preparing the area of implementation
    • Obtaining compliance certificate from TEDAŞ and Distribution Company for the completed plant (provisional acceptance)
    • Installing the network connection and delivery of plant to investor
    • Providing training for the plant personnel

Products used in the Solar Power Plant

GSR Enerji offers the services of procurement, assembly, commissioning, maintenance and servicing of products required for a Solar Power Plant. The system components required for a Solar Power Plant include the following;

* Photovoltaic Panels

* Photovoltaic Inverters and remote monitoring system

* Weather Sensors

* Bearing Construction

* DC cables and connectors for connection of panel and inverter

* Communication cables and accessories for the connection of inverter and remote monitoring system

* Low Voltage (LV) switchgear panels

* AC cables for connection of inverter and HV panel

* Substation and distribution center buildings with transformer, cell and transformer cubicle

* Medium voltage (MV) cables or power transmission line for connection of photovoltaic system with the mains supply

* SCADA - Automation system and accessories

* CCTV camera system and accessories for plant safety

* Wire fence and lighting system for the safety of plant land

  • Post-Construction Maintenance
    • On-site solution of technical or natural issues and problems at the plant
  • Survey
    • For the plants with completed construction;
      • Checking production values
      • Compliance with SPP projects
      • Checking the materials used
      • Reporting the changes occurred after the construction